MCP platform rollout checklist with four phase gates

A four-phase MCP rollout plan with a gate after each. Spike the sign-in and tool filtering first, then the paved road, governance and user delegation.

Chatis Santos · October 19, 2026 · 4 min read · For engineers and leaders

Roll a shared MCP platform out in four phases, and don't start a phase until the one before it has passed its gate with real clients. The design is one Model Context Protocol (MCP) gateway in front of team-owned backends, with FusionAuth handling sign-in and team roles, and this is the checklist I gave Northfield Energy for it. Phase 0 matters most. It settles the FusionAuth and gateway authorization questions with running code before any team builds on the platform.

The architecture paper sizes phase 0 at about two weeks and phases 1 and 2 at about a month each, with one platform engineer and one friendly first team, and leaves phase 3 open-ended. Hold all of those loosely until phase 0 has run.

Phase 0: spike

This phase proves sign-in and per-tool filtering with real clients.

Ships

  • FusionAuth application (authorization code with PKCE) with Google as the identity provider.
  • One hello-world MCP behind the gateway.
  • Connections from Claude.ai, Claude Code and one agent on Bedrock AgentCore.

Decide now whether Cursor is in v1. Each client type adds an OAuth client to test.

Gate

  • Dynamic client registration (RFC 7591) works, or each client type has a pre-registered client ID that engineers can paste in.
  • The token's aud claim names the gateway and the gateway validates it.
  • Team roles arrive in the JWT and the gateway filters tools/list by them. Rejecting tools/call while listing every tool doesn't pass.
  • The AgentCore agent gets its own token through the client credentials grant (FusionAuth Entities, which depend on your plan) with its own roles.
  • The gateway serves /.well-known/oauth-protected-resource pointing at FusionAuth, and forwards caller claims (sub, email, roles) to the target.
  • Gateway quotas are known: targets per gateway, tools per target, request and response size, timeout.
  • Region availability and per-call pricing checked against expected volume.

If the handshake fails, a thin reverse proxy in front of the gateway can serve the discovery documents. If the gateway can't filter the list per role, fall back to a FusionAuth application per gateway.

I wrote up how to run this phase in Turning an AI architecture doc into a two-week spike.

Phase 1: paved road

After this phase a team ships an MCP by merging a PR.

Ships

  • Registry repo with teams.yaml, the manifest schema and CODEOWNERS per directory.
  • Server template with logging, health checks, credential loading and a contract test wired in.
  • CI that validates the manifest, builds the image, deploys the backend under the team's own IAM role and registers the target.
  • First real MCP: the data platform, calling its warehouse as a service account.

Gate

  • A second team ships an MCP with no platform-team involvement.

Before this phase starts, decide per downstream system whether a tool calls it as a service account or as the signed-in engineer, because if Salesforce writes or Gmail need a person's name on the action from day one then the token vault moves into this phase and the sizing above is wrong.

Phase 2: governance

After this phase the guardrails run in CI and at the gateway.

Ships

  • Policy-as-code rules (Open Policy Agent or Cedar) that CI checks on every PR.
  • Central audit log at the gateway: subject, roles, gateway, tool, argument hash, decision, result status and latency.
  • Catalog page regenerated on merge, showing what exists and who owns it.
  • Tool namespaces (data.run_sql) and gateway tool search.
  • Per-team rate limits and quotas at the gateway.

Gate

  • A destructive tool shared to eng-all fails CI unless a security approver signed the PR.

The papers put namespacing in phase 2, but I'd do it in phase 1. Renaming tools later breaks saved prompts and agent code.

Phase 3: user delegation

After this phase, tools that need to act as the signed-in person can.

Ships

  • Token vault (AgentCore Identity if you're on AgentCore, otherwise a small token broker of your own).
  • Google and Salesforce consent flows, one consent per engineer per provider.
  • Workload identity for agents, with their own roles.
  • Human confirmation for destructive tools in agent flows.

Gate

  • Gmail and Drive tools act as the signed-in user, and the audit trail names the person.

Prototype the consent flow with one tool before promising teams on-behalf-of access. How the consent link reaches a chat client is unverified in the papers, and so are the other AgentCore specifics here (Identity as the vault, tool search, workload identity, Runtime as a target). Nobody checked them when the papers were written, so do that before planning the phase.

If you're deciding this

Run phase 0 before agreeing to a date for the rest. Two weeks of spike is cheap next to a month of building on a gateway that rejects calls it should have hidden. Your gate list is the thing I'd want to see if you'd like a second opinion on the plan.

More in this series

All articles in the series